South Terrace Urology were seeking to offset their ever increasing energy costs to proof their business and insulate them from future energy rises.
Our professional team managed the entire process, designing and installing a system matched to their consumption.
This installation involved working for 4 days on an operating medical facility. At all times, we had to ensure noise levels and disruptions to staff and patient access were kept to a minimum.
