Pikes Winery, an iconic brand in South Australia, were seeking to offset their ever increasing energy costs whilst enhancing their already ‘Clean and Green’ credentials.

Our professional team managed the entire process, including the securing of the Ausindustry Clean Technology Grant.

This project demonstrated our capability with large scale installations in rural locations which are notorious for poor quality and fluctuating power. The installation of Tilt-Frame to 70% of the installation achieved optimum generation of power from the Solar System for Pikes Winery.

The project involved 9 days of onsite work and has delivered over 300kWh per day on average since the installation. Output is on target with projections and all project costs were within budget.

Recent Projects

Solar Project

Adelaide Town Hall

Installation: Working within the limits of a heritage listed building in the heart of the city bought with it many challenges. These ranged from fitting

Read More »
Solar Project

North Adelaide Aquatic Centre

Installation: The SA Power Networks Engineering Study defined the requirements for the project and Network Protection Unit, which included incorporating a ComAp Intellipro protection relay,

Read More »
Solar Project

UniSA Pridham Hall

This installation involved working over 23 days on a multi-level new build construction site which was to become UniSA’s centrepiece in Adelaide’s CBD. With this